QUALITY CONTROLS: Technological
superiority of products coupled with widening of the product range and
meaningful diversification of activities in manufacture has helped this
Company grow in pioneer development of commercial recovery vans and
manufacture of heavy duty and light recovery breakdown wreckers. Quality
Control originates chemical and metallurgical compositions from testing
of Raw materials with modern testing devices in ultra modern laboratories
test houses, quality control authorities agencies of Government, measuring
components with set standards of dimensional accuracy and it extends to
inspecting sub assemblies and testing samples in the range of up-to-date
test rigs.
The product range design & developed by the Company so far is the result of
technical suggestions and recommendations given
by the team of experts , highly qualified engineers and technocrats
nominated by the Intendors from time to time to
access the Company's reliability, expertise product quality and high
quality workmanship. Besides, the wrecker designed and developed for Indian
Army successfully qualified for induction in Indian Army after quality tests
under all weather conditions and in high altitudes.
(A) PROCUREMENT OF RAW
MATERIALS: The raw materials are purchased from reputed
manufacturers, authorized dealers, sole selling agents which have ISI or
ISO specification and their quality is ensured by the quality checks are
regulatory employed at the following stages.
-
Getting test certificate from the
suppliers, and the laboratory test reports
-
Testing the materials in
authorized test houses like National Physical Laboratory, Shriram Test
House, R.K.
Inspection & Testing House
In house stress tests with
testing equipments and measuring components with set standards of
dimensional accuracy.
(B)ASSEMBLING OF PARTS: At
the time of assembling of parts, the assemblies are tested to its
quality performance. All fitments are thoroughly checked and required
lubrication is applied wherever is considered necessary to prevent the
equipment from erosion and rustication. Due attention is paid to quality
packing to save the parts from spoilage.
(C)PERFORMANCE TRIAL
OF RECOVERY WRECKER:The wrecker equipment fitted on the chassis is
put to load lifting test, for which dead weight compound is lifted with the
help of booms, with or without proper anchorage and hookup application.
Derricking test is conducted by lifting disabled on roads loaded
vehicles and its shifting to workshops. The digging out operations are
done by digging out the dead weight or disabled damaged vehicles from deep
ditch and recover it for safer place.
(D)DELIVERY
PERFORMANCE TRIAL:After delivery of the wrecker equipment to
the Indentors the vehicle is put on performance trail of running hours on
recovery operation and in running mileage basis.During the course of
performance trial all components of wrecker are examined closely as per
specifications, and procedure and the vehicle are stamped for quality
assurance. |