QUALITY

Quality Controls

Technological superiority of products coupled with widening of the product range and meaningful diversification of activities in manufacture has helped this Company grow in pioneer development of commercial recovery vans and manufacture of heavy duty and light recovery breakdown wreckers. Quality Control originates chemical and metallurgical compositions from testing of Raw materials with modern testing devices in ultra modern laboratories test houses, quality control authorities agencies of Government, measuring components with set standards of dimensional accuracy and it extends to inspecting sub assemblies and testing samples in the range of up-to-date test rigs.
The product range design & developed by the Company so far is the result of technical suggestions and recommendations given by the team of experts, highly qualified engineers and technocrats nominated by the Intendors from time to time to access the Company's reliability, expertise product quality and high quality workmanship. Besides, the wrecker designed and developed for Indian Army successfully qualified for induction in Indian Army after quality tests under all weather conditions and in high altitudes.

(A) PROCUREMENT OF RAW MATERIALS: The raw materials are purchased from reputed manufacturers, authorized dealers, sole selling agents which have ISI or ISO specification and their quality is ensured by the quality checks are regulatory employed at the following stages.

  • Getting test certificate from the suppliers, and the laboratory test reports
  • Testing the materials in authorized test houses like National Physical Laboratory, Shriram Test House, R.K. Inspection & Testing House

In house stress tests with testing equipments and measuring components with set standards of dimensional accuracy.

(B)ASSEMBLING OF PARTS: At the time of assembling of parts, the assemblies are tested to its quality performance. All fitments are thoroughly checked and required lubrication is applied wherever is considered necessary to prevent the equipment from erosion and rustication. Due attention is paid to quality packing to save the parts from spoilage.

(C)PERFORMANCE TRIAL OF RECOVERY WRECKER: The wrecker equipment fitted on the chassis is put to load lifting test, for which dead weight compound is lifted with the help of booms, with or without proper anchorage and hookup application. Derricking test is conducted by lifting disabled on roads loaded vehicles and its shifting to workshops. The digging out operations are done by digging out the dead weight or disabled damaged vehicles from deep ditch and recover it for safer place.

(D)DELIVERY PERFORMANCE TRIAL: After delivery of the wrecker equipment to the Indentors the vehicle is put on performance trail of running hours on recovery operation and in running mileage basis.During the course of performance trial all components of wrecker are examined closely as per specifications, and procedure and the vehicle are stamped for quality assurance.